Home / C20 to C13 smart power cable

Rack PDU · IEC C20 male input

Add remote control to a C19 PDU outlet with a C20-to-C13 cable.

Smart Kablo C20 to C13 connects its C20 male input to an IEC C19 female rack PDU outlet. Its C13 female output supplies compatible equipment with an IEC C14 inlet while adding per-device measurements and authorised relay control.

Smart Kablo with IEC C20 male input for a C19 rack PDU outlet and IEC C13 female output

Select the image to inspect both connectors at full size.

A C20 connector does not raise the Smart Kablo current limit. The connected equipment must remain at or below 5 A.

IEC C20Male input for a C19 rack PDU outlet
IEC C13Female output for an IEC C14 equipment inlet
5 A maximumUnchanged by the higher-capacity source connector
Rack visibilityPer-device measurements and relay state
Connection review

Connector fit is not a current approval.

The C20 input is designed for a C19 female rack PDU outlet, but the Smart Kablo and connected equipment must still remain within the verified 5 A maximum.

  1. 1Rack PDUIEC C19 female source outlet
  2. 2Smart KabloIEC C20 male input
  3. 3IT equipmentIEC C13 female output to an IEC C14 inlet
Verified specification
Source connectionIEC C19 female outlet
Cable inputIEC C20 male
Equipment outputIEC C13 female
Equipment inletIEC C14
Maximum current5 A
Measured valuesVoltage, current, frequency, power and energy
ConnectivityBluetooth onboarding and Wi-Fi operation
Important: never infer allowable load from the PDU outlet alone. Check the equipment nameplate, connector condition, grounding and the complete power path before installation.
Selected-outlet upgrade

Add intelligence where a full PDU replacement is unnecessary.

Use an inline Smart Kablo for selected compatible servers, switches, NAS systems or other C14-inlet equipment when per-device data and controlled recovery are the actual requirement.

Measure the individual load

View voltage, current, frequency, power and energy at the selected equipment connection instead of relying only on a rack total.

Identify the target

Use device records and physical identification procedures to confirm the correct connection before any remote intervention.

Power-cycle deliberately

Only interrupt power after the equipment, application and storage shutdown requirements have been considered.

Integration scope

Documented REST endpoints; SNMP only after technical confirmation.

The published REST guide covers Basic Authentication, live telemetry, hourly and monthly energy data, and relay endpoints. It does not document a specific SNMP version, MIB/OID set, trap support or write capability.

Choose by source outlet

Compare the connection families.

C14 to C13

For a standard IEC C13 female outlet on a compatible PDU or UPS.

C20 to C13

For an IEC C19 female rack PDU outlet and compatible C14-inlet equipment.

Schuko to C13

For a grounded Schuko source outlet and compatible C14-inlet equipment.

Setup, operation and evidence

Confirm the physical target, complete setup and shut down safely.

Keep the cable’s record matched to the actual rack outlet and equipment. Bluetooth handles nearby onboarding; Wi-Fi provides the network path for authorised remote operation. Keep the local management interface on an approved secure network rather than exposing it unprotected to the internet.

  1. Complete device identification and ownership assignment beside the equipment. Use the UID indicator and inventory record to identify the physical cable. The green UID LED can flash at one-second intervals.
  2. Configure Wi-Fi, then verify measurements, relay state, the device name and the connected load before granting relay-control permission.
  3. Use the documented REST endpoints for Basic Authentication, live telemetry, hourly/monthly energy and relay operations. Confirm SNMP version, MIB/OID, traps and write permissions separately for the installed model and firmware.
  4. Move workloads where appropriate, then shut down applications, filesystems and the operating system. Confirm shutdown before opening the relay.
  5. Wait for the equipment manufacturer’s recommended off interval before restoring power. Smart Kablo provides neither battery backup nor voltage regulation and does not independently perform a graceful OS or service shutdown.

Internal SK-WR5A continuous-load record

The 18 August 2026 test report covers one SK-WR5A sample over one hour, with average recorded current of 4.280 A and active power of 692.3 W. This is an internal continuous-load record, not independent certification, a CE/RoHS/LVD certificate or a measurement-accuracy certificate. It does not approve every equipment model or replace the nameplate and 5 A checks.

Technical scope

The continuous-current limit remains 5 A; the corresponding apparent power at 230 V is 1,150 VA. Apparent power is not a promise of 1,150 W for every load. Check nameplate input current and startup demand as well as physical connector fit.

Review published documents or open the REST API guide before planning integration.

Match the source connector and keep the 5 A limit.

All three models use an IEC C13 female equipment output for a compatible C14 inlet. A C19 outlet or C20 plug does not raise Smart Kablo’s current limit.

ModelSource outletCable inputEquipment connectionChoose it when
C14–C13IEC C13 female PDU/UPS outletIEC C14 maleC13 female output → C14 equipment inletThe PDU or UPS has a compatible C13 outlet
C20–C13IEC C19 female rack PDU outletIEC C20 maleC13 female output → C14 equipment inletThe source has a compatible C19 outlet
Schuko–C13Suitable grounded Schuko wall outletSchuko plugC13 female output → C14 equipment inletThe equipment is supplied from a suitable wall outlet

Plan cable length, module placement and volume requirements.

Start with selected priority connections and expand after verifying the operating workflow. Custom cable length and module placement near the PSU, in the middle or near the PDU can be reviewed with the technical team. Ask about quantity pricing for 5, 10 and 20-plus units; availability, configuration and any discount are confirmed in the quotation.

Share the source outlet, equipment inlet and nameplate, required quantity, cable length, installation country and integration needs. International enquiries remain subject to a technical quotation; tax treatment, shipping, warranty and delivery terms are confirmed for the destination rather than inferred from Türkiye’s domestic price or shipping statements.

Short answers

C20 to C13 compatibility FAQ.

Which outlet and equipment can use C20–C13?
Its C20 male input connects to an IEC C19 female rack PDU outlet; its C13 female output mates with a C14 equipment inlet. The equipment nameplate input current must be 5 A or less, and startup demand must be suitable.
Does a C20 connector permit more than 5 A?
No. Physical compatibility with a higher-rated PDU outlet does not raise the Smart Kablo limit. Do not use this model if the equipment nameplate exceeds 5 A.
What are Bluetooth and Wi-Fi used for?
Bluetooth is used for nearby device onboarding and ownership assignment. Once Wi-Fi setup is complete, the authorised interface provides remote measurements, relay state and supported control functions.
Does Smart Kablo replace a UPS, and how should I power-cycle equipment?
No. It provides no battery backup and is not a UPS. Shut down applications, storage and the operating system in a controlled way first. Verify shutdown, disconnect the supply through the relay, wait for the manufacturer’s recommended interval and restore power.
Where can I verify REST API and SNMP scope?
The REST API user guide (Turkish PDF) documents authentication, live telemetry, hourly/monthly energy and relay endpoints. It does not document the SNMP version, MIB/OID list, traps or write permissions; confirm those for the exact model and firmware.
What does TestReports.pdf establish?
The internal SK-WR5A sample report dated 18 August 2026 records a one-hour continuous-load test with averages of 4.280 A and 692.3 W. It is not a CE, RoHS, LVD or measurement-accuracy certificate and does not replace the equipment nameplate and 5 A compatibility checks.
Can it reboot a dual-PSU server?
One feed may not remove power from a redundant server. Document both PSU connections and use the approved equipment recovery procedure; do not assume one relay command restarts the whole server.

Review the PDU outlet and equipment nameplate before quoting.

Send photos or specifications for the C19 outlet, equipment inlet, current rating, required cable length and integration scope.

Request a C20 review
Inspect the connections and measurement screens.

C14, C20 and Schuko product images, connector diagram and mobile energy data.

Open the image gallery →